This was a loud messy 4 day project. We now have beautiful new 1 1/2 inch copper piping into the house and better water pressure. The old lead..yes corroded lead valve that connected our house water to the main line on the street has also been replaced...I cringed when I say what our water had been running through.
Friday, November 27, 2009
Week 11
This was a loud messy 4 day project. We now have beautiful new 1 1/2 inch copper piping into the house and better water pressure. The old lead..yes corroded lead valve that connected our house water to the main line on the street has also been replaced...I cringed when I say what our water had been running through.
Thursday, November 19, 2009
Week 10 p.s.
Wednesday, November 18, 2009
Week 10
Sunday, November 8, 2009
Week 8 part two
Tuesday, November 3, 2009
Wednesday, October 21, 2009
Thursday, October 15, 2009
Thursday, October 8, 2009
Saturday, September 19, 2009
Sunday, September 13, 2009
Thursday, September 10, 2009
Before
Subscribe to:
Comments (Atom)




