Friday, November 27, 2009

Week 11

"Bye bye curb appeal, Hello new water line"
This was a loud messy 4 day project. We now have beautiful new 1 1/2 inch copper piping into the house and better water pressure. The old lead..yes corroded lead valve that connected our house water to the main line on the street has also been replaced...I cringed when I say what our water had been running through.

They dug a 7 foot hole in the road, the sidewalk, and the front of our house

This is what you want to wake up to at 7:30am right?

No comments:

Post a Comment