This was a loud messy 4 day project. We now have beautiful new 1 1/2 inch copper piping into the house and better water pressure. The old lead..yes corroded lead valve that connected our house water to the main line on the street has also been replaced...I cringed when I say what our water had been running through.
Friday, November 27, 2009
Week 11
This was a loud messy 4 day project. We now have beautiful new 1 1/2 inch copper piping into the house and better water pressure. The old lead..yes corroded lead valve that connected our house water to the main line on the street has also been replaced...I cringed when I say what our water had been running through.